Reliance Gas Transportation Infrastructure Limited (RGTIL) is operating its prestigious East-West Gas pipeline (EWPL), since 2008-2009; project comprising of 48" dia. 1375 km long trunk pipeline, with 11 nos of compressor stations and several spur lines of different diameters varying from 10" to 30". Cathodic Protection (CP) system for buried pipeline, piping and structures is critical for ensuring protection against external corrosion due to environmental interaction. For successful implementation of CP system from day one of pipeline laying; planning and considerations starts at conceptual stage of project itself, then proper planning, design and implementation to follow. Other than considerable length and diameter of pipeline; uniqueness for EWPL CP requirements are in form of 3 nos. Micro-tunnel crossings, 11 nos of Compressor stations (CS) with underground piping, more than 100 cased crossings, several HDD, third-party pipelines, AC & DC Railway traction crossings and pipeline passing through different geography from East to West. Paper discusses the implementation of CP system for EWPL; highlighting critical points for execution of the job in each phase from Engineering till commissioning and O&M, CS CP system, CP for pipe within Micro-tunnelling, several interference and mitigation actions, post-commissioning surveys etc.
机译:自2008年至2009年,信实天然气运输基础设施有限公司(RGTIL)一直在运营其着名的东西气管道(EWPL);该项目包括48英寸(直径),1375公里长的干线管道,11个压缩机站和几条直径从10英寸到30英寸不等的支线。用于地下管道,管道和结构的阴极保护(CP)系统对于确保不受环境影响而受到外部腐蚀的保护为了从管道铺设的第一天开始就成功实施CP系统,规划和考虑应从项目本身的概念阶段开始,然后进行适当的规划,设计和实施。管道数量; EWPL CP要求的唯一性是3个微型隧道交叉口,11个带地下管道的压缩站(CS),100多个套管式交叉口,数条HDD,第三方管线,交直流铁路牵引通道和穿越东西方不同地理区域的管道。论文讨论了EWPL CP系统的实施;突出了关键点从工程到调试和运行与维护,在每个阶段执行工作,CS CP系统,微隧道内管道的CP,若干干扰和缓解措施,投产后勘测等。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号