首页> 外文会议>Proceedings of the Third ESA electronic components conference(EECC'97) >Analysis of costs non conformance's detected on esaqpl parts during L. A. T. and C. S. I. Inspections
【24h】

Analysis of costs non conformance's detected on esaqpl parts during L. A. T. and C. S. I. Inspections

机译:在L.A.T.和C.S.I.检查期间在esaqpl零件上检测到成本和不合格的分析

获取原文
获取原文并翻译 | 示例

摘要

The Cost reduction of E. E. E. Parts during Procurement phase has been always an important issue for all Space Programmes. This paper analyses the Major NCR's with Lot related failures detected during Quality Conformance Inspections (Q.C.I.) as Precap or LAT / Final Customer Source Inspections (F.C.S.I.) performed on ESAQPL parts for a specific Space Programme (Artemis) versus the various Costs involved as.
机译:在采购阶段降低电子零件的成本一直是所有空间计划的重要问题。本文分析了在质量符合性检查(Q.C.I.)期间检测到的与批次相关的主要NCR,作为针对特定航天计划(Artemis)的ESAQPL零件执行的封顶或LAT /最终客户来源检查(F.C.S.I.)与所涉及的各种成本的比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号