首页> 外文会议>Process control, electrical amp; information conference ISA Pupid 38th annual symposium >Electrical raceway selection in papermills from a total life cycle perspective
【24h】

Electrical raceway selection in papermills from a total life cycle perspective

机译:从总生命周期角度看造纸厂的电气滚道选择

获取原文
获取原文并翻译 | 示例

摘要

Mnay dollars have, and are being spent, to install, repair and replace electrical raceways. In some cases the raceways are so specified that they oulast the process that they are serving. We, as owners, specifiers, installers and venders must do a better job in understanding the problems being faced in a papermill environment. There are many opportunities to improve in the proper selection and installation of these systems.
机译:过去已经并且正在花费安装,修理和更换电气滚道。在某些情况下,必须对滚道进行特殊规定,以免影响其所服务的过程。作为所有者,说明者,安装者和出售者,我们必须更好地了解造纸厂环境中面临的问题。有很多机会可以改善这些系统的正确选择和安装。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号