首页> 外文会议>Project experiences in research reactor ageing management, modernization and refurbishment >PREVENTIVE AND PREDICTIVE MAINTENANCE, WAREHOUSING OF SPARES, PERIODIC TESTING AND IN-SERVICE INSPECTION ACTIVITIES AT THE NIGERIAN RESEARCH REACTOR-1 FACILITY
【24h】

PREVENTIVE AND PREDICTIVE MAINTENANCE, WAREHOUSING OF SPARES, PERIODIC TESTING AND IN-SERVICE INSPECTION ACTIVITIES AT THE NIGERIAN RESEARCH REACTOR-1 FACILITY

机译:尼日利亚研究机构1设施的预防性和预防性维护,备件库存,定期测试和在职检查活动

获取原文
获取原文并翻译 | 示例

摘要

The Nigerian Research Reactor-1, or NIRR-1, is sited at Centre for Energy Research and Training, Ahmadu Bello University, Zaria, Nigeria. Activities on preventive or routine maintenance have been institutionalized since the commissioning of the reactor in February 2004. This has grossly reduced the rates of corrective maintenance activities and helped the reactor management a great deal in predicting failure rates of reactor components and other auxiliary units. Routine maintenance of systems and components are being carried out on a weekly, quarterly and annual basis based on manufacturer's recommendations, which have been reviewed and improved over the years. The paper presents the implementation of maintenance activities in NIRR-1 from its initial criticality in 2004 till today and the new scheme for periodic testing and in-service-inspection developed after an IAEA Integrated Safety Assessment of Research Reactors mission. The measures put in place are envisaged to reduce the negative impact of ageing on NIRR-1 and its auxiliary systems.
机译:尼日利亚研究堆1或NIRR-1位于尼日利亚扎里亚阿马杜贝洛大学能源研究与培训中心。自2004年2月反应堆投产以来,预防性或常规维护活动已经制度化。这大大降低了纠正性维护活动的比率,并帮助反应堆管理人员在很大程度上预测反应堆组件和其他辅助装置的故障率。根据制造商的建议,每周,每季度和每年对系统和组件进行例行维护,这些建议已经过多年审查和改进。本文介绍了NIRR-1的维护活动从2004年最初的关键阶段到今天,以及在IAEA研究堆综合安全评估任务之后制定的定期测试和在役检查新计划。计划采取措施减少老化对NIRR-1及其辅助系统的负面影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号