首页> 外文会议>Pulp and Paper Industry Technical Conference, 2009. PPIC '09 >Proper testing of protection systems ensures against false tripping and unnecessary outages
【24h】

Proper testing of protection systems ensures against false tripping and unnecessary outages

机译:正确测试保护系统可确保避免误跳闸和不必要的停机

获取原文

摘要

This paper discusses the role of three-phase primary injection testing as an important part of the substation commissioning process. Individually testing the components of a protective relay scheme is common practice. Many times, this testing is performed without looking at how the equipment under test interacts with all the other components of the protective relay scheme. Several relay misoperations can be avoided by executing an overall testing plan with all the interconnected components. Three-phase primary current injection tests can be easily performed during equipment commissioning and can detect mistakes that would otherwise only be detected when load is available. This paper describes the planning, execution, and analysis of results of three-phase primary injection tests.
机译:本文讨论了三相一次注入测试在变电站调试过程中的重要作用。单独测试保护继电器方案的组件是常见的做法。很多时候,执行此测试时不会查看被测设备如何与保护继电器方案的所有其他组件交互。通过对所有互连组件执行总体测试计划,可以避免几次继电器误操作。三相一次电流注入测试可以在设备调试期间轻松进行,并且可以检测出只有在有负载​​时才可以检测到的错误。本文介绍了三相一次注入测试结果的计划,执行和分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号