THE $1.4B WATERVIEW CONNECTION MOTORWAY TUNNELS—OUTCOMES AND PROGRESS FROM A CLIENT’S PERSPECTIVE

机译:$ 1.4B的Waterview连接高速公路隧道-客户的观点和进展

获取原文
获取原文并翻译 | 示例

摘要

The New Zealand Transport Agency (TA) commenced its procurement process in 2010rnand awarded a Design and Build with subsequent Maintain and Operate Alliance contractrnin November 2011 to a consortia of local and international designers and contractors.rnThe project comprises twin 14.0 m OD tunnels) with associated motorwayrnto motorway connections and is currently the largest tunneling project underway inrnthe Southern hemisphere. With completion of the Design and Build phase scheduledrnfor late 2016 this paper will describe the challenges and achievements to date from arnClient perspective operating within a Collaborative contract model (Project Alliancing).
机译:新西兰运输局(TA)于2010年开始其采购流程,并于2011年11月授予了一个由本地和国际设计师和承包商组成的财团,并获得了设计和建造以及随后的维护和运营联盟合同。该项目包括两条14.0 m OD隧道和相关高速公路连接高速公路,目前是南半球正在进行的最大的隧道工程。随着计划在2016年底完成的设计和建造阶段的完成,本文将从arnClient角度描述在协作合同模型(项目联盟)中运作的挑战和成就。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号