首页> 外文会议>Rapid Excavation and Tunneling Conference 2015 proceedings >“BART TO SAN JOSE” PHASE Ⅱ—SILICON VALLEY SANTA CLARA EXTENSION (SVSX)
【24h】

“BART TO SAN JOSE” PHASE Ⅱ—SILICON VALLEY SANTA CLARA EXTENSION (SVSX)

机译:“巴特到圣何塞”第二阶段-硅谷圣克拉拉扩展(SVSX)

获取原文
获取原文并翻译 | 示例

摘要

This paper describes the evolution of the underground SVSX portion of the Santa ClararnCounty Valley Transportation Authority’s (VTA) Silicon Valley Rapid Transit (SVRT)rnProgram in Santa Clara County, California, which includes approximately 5 miles ofrntwin bored tunnels and underground transit stations associated with extension of thernBART heavy rail transit system. On hold since 2009, the VTA is initiating efforts to preparernsupplemental federal and state environmental clearance documents for SVSX,rnand the paper will provide an update on the project status including alignment and stationrnlocations being evaluated, with a potential schedule for design and construction.
机译:本文介绍了加利福尼亚州圣塔克拉拉县圣塔克拉拉郡县谷交通管理局(VTA)硅谷快速运输(SVRT)rn计划的地下SVSX部分的演变,该计划包括约5英里长的无聊隧道和与扩建相关的地下运输站的BART重型轨道交通系统。自2009年以来,VTA暂停进行工作,以准备SVSX的补充联邦和州环境审批文件,该文件将提供项目状态的最新信息,包括正在评估的路线和驻地,以及设计和施工的潜在时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号