首页> 外文会议>Rapid Excavation and Tunneling Conference 2015 proceedings >PERFORMANCE PREDICTION ASSESSMENTS OF A HARD ROCK TBM USED IN MINING DEVELOPMENT
【24h】

PERFORMANCE PREDICTION ASSESSMENTS OF A HARD ROCK TBM USED IN MINING DEVELOPMENT

机译:矿山开发中硬岩TBM的性能预测评估

获取原文
获取原文并翻译 | 示例

摘要

Tunnel boring has shown to be a suitable excavation method on underground expansion.rnMining development requires often long tunnels with limited access points whichrnhave to be constructed on a limited amount of time. In many cases, Tunnel BoringrnMachines (TBMs) can be a good choice of tunnelling method. Planning and risk managementrnis of greater importance for technical successfulness and economic benefitrnon tunnel boring compared to drill and blast tunnelling. Therefore, good predictions ofrnperformances and excavations costs take great importance for this issue. A completernanalysis of geological mapping from probe drilling cores, rock drillability testing andrnTBM log data has been performed in order to analyze performances on a hard rockrnTBM used in mining development. Assessments and comparison between actual andrnperformance predictions by using the NTNU prediction model for hard rock TBMs hasrnbeen carried out.
机译:隧道掘进已被证明是一种适合地下扩展的开挖方法。采矿开发通常需要较长的隧道,且具有有限的出入点,因此必须在有限的时间内建造。在许多情况下,隧道镗床(TBM)可能是隧道方法的不错选择。规划和风险管理对于钻探和爆破隧道技术的成功和经济利益而言,比隧道掘进更重要。因此,对性能和挖掘成本的良好预测对于此问题非常重要。为了分析在采矿开发中使用的硬岩石TBM的性能,已经对探针钻芯,岩石可钻性测试和rnTBM测井数据进行了完整的地质分析。已经使用NTNU预测模型对硬岩TBM进行了实际和性能预测之间的评估和比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号