4,520m Fujikawa Tunnel in Shizuoka Prefecture, Japan, is being driven on the New Tomei Expressways which will run from Tokyo to Nagoya for a distance of approximately 330 kilometers. Very difficult and varied ground conditions were predicted on the Fujikawa Tunnel Project. The hard rock TBM was applied to excavate a Pilot Tunnel and serve as a guide providing vital information for subsequent tunnel enlargement work. To identify these difficult ground conditions prior to encountering them in the TBM face, Kajirna applied a new method of seismic tomography. A newly developed hard rock TBM excavation monitoring and control system was also been applied to collect and analyze machine data for torque, thrust and excavation speed as well as with the excavated geologic records. By combining these information, a safer and more efficient tunneling operation has been secured.
机译:位于日本静冈县的4,520m富士河隧道正在新Tomei高速公路上行驶,该高速公路将从东京开往名古屋,全长约330公里。藤川隧道项目预计会有非常困难且变化多端的地面条件。硬岩隧道掘进机被用于开挖先导隧道,并作为指导,为后续的隧道扩建工作提供重要信息。为了在TBM面遇到这些困难的地面条件之前确定这些困难的地面条件,Kajirna应用了一种新的地震层析成像方法。还使用了新开发的硬岩TBM开挖监控系统,以收集和分析机器数据的扭矩,推力和开挖速度以及开挖的地质记录。通过组合这些信息,可以确保更安全,更有效的隧道作业。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号