THE EXPANSION OF TARKWA CIL PLANT FROM 4.2MTPA TO 12MTPA

机译:塔克瓦工厂从4.2MTPA扩展到12MTPA

获取原文
获取原文并翻译 | 示例

摘要

Tarkwa Gold Mine is located in south western Ghana, and is majority owned and operated by Gold Fields Ghana Limited. The Tarkwa CIL plant utilises a single low aspect 27' × 42' 14MW dual pinion drive SAG mill designed to mill 4.2mtpa (525tph). The plant was designed and constructed in a manner that would facilitate its expansion to 8.4mtpa (1,050tph). Since the plant was commissioned in September 2004, the SAG mill has consistently exceeded its nameplate throughput by up to 25%. Through the installation of a 26' × 36' 14MW dual pinion drive Ball mill along with additional upstream and downstream equipment, the plant will now be expanded to 12mtpa (1,500tph). This paper endeavours to outline the process and engineering design challenges along with the future construction challenges of the expansion in the midst of a fully operational plant.
机译:Tarkwa金矿位于加纳西南部,由Gold Fields Ghana Limited拥有和经营。 Tarkwa CIL工厂使用了一个低立面27'×42'14MW双小齿轮驱动SAG轧机,该轧机设计用于轧制4.2mtpa(525tph)。该工厂的设计和建造方式有利于将其扩大至8.4mtpa(1,050tph)。自从2004年9月工厂投产以来,SAG轧机的产量一直超过其铭牌上的产量达25%。通过安装26'×36'14MW双小齿轮驱动球磨机以及额外的上游和下游设备,该工厂现在将扩大到12mtpa(1,500tph)。本文致力于概述过程和工程设计方面的挑战,以及在全面运营的工厂中进行扩建所带来的未来建设挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号