THE DESIGN, COMMISSIONING AND OPERATION OF THE CASTLE VALLEY PLANT IN WELLINGTON, UT

机译:犹他州惠灵顿城堡谷厂的设计,调试和运营

获取原文
获取原文并翻译 | 示例

摘要

The new coarse wash only D.M.V. Castle Valley Plant at Wellington, Utah has been successfully commissioned.rnVery high levels of processing efficiently, availability and sub-budget costs have been achieved.rnThe plant has been able to economically recover coal from waste dumps and dike contaminated coal from a sister company.rnThe plant has enabled Dugout Mine to process high ash material with marginal salability. This processing has generated a salable product at high yield.rnThe success of the project has been largely as a result of the hand work devotion of Mike Kelley, Plant Manager and his plant crew. The support and assistance of Dugout Mine and AWBG senior management, as well as ACI senior corporate management were instrumental in getting the project off the ground. The construction of the facility by CEntry was completed safely, on schedule, at budget and to a very high standard.
机译:新的仅粗洗D.M.V.位于犹他州惠灵顿的Castle Valley工厂已成功投产。rn高效地进行了高水平的加工,可获得可用性和子预算成本。rn该工厂已能够经济地从废物场中回收煤炭,并从姊妹公司中清除受污染的煤炭。 rn该工厂使Dugout矿能够处理具有少量可销售性的高灰分物料。这种加工产生了可销售的高产量产品。该项目的成功很大程度上归功于工厂经理Mike Kelley和他的工厂工作人员的手工奉献。 Dugout矿山和AWBG高级管理层以及ACI高级企业管理层的支持和协助对项目的启动起到了重要作用。 CEntry对该设施的建设按计划,预算和高标准安全完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号