首页> 外文会议>SPE hydrocarbon economics and evaluation symposium >NEt pay determination for primary and waterflood deplection mechanisms
【24h】

NEt pay determination for primary and waterflood deplection mechanisms

机译:NEt决定主要和注水变形机制的费用

获取原文
获取原文并翻译 | 示例

摘要

New pay,as represented by thickness (h),is one of the most important parameters used in volumetric estimates of in-place khydrocarbons,well test interpretations,fluid injection analysis (water,gas,or enhanced recovery mehtods),reservoir engineering studies,or unitizasiton procedrues.Unfortunately,the petroleum engineering and geologicla literature provides very limited insight into jhow new pay should be ocmputed.For a porous interval to be counted as net pay,.the interval must contain hydrocarbons,be reasonably permeable,and for waterfloods,be laterally continuous from injector to producer.The issue is what protaion of htis interval coan be porduced to yield meaningful quantities of hydrocarbons usnder the particular drive mechanism.
机译:以厚度(​​h)表示的新工资是用于就地碳氢化合物的体积估算,试井解释,流体注入分析(水,气或提高采收率的方法),储层工程研究,不幸的是,石油工程和地质学文献对如何采用新的支付方式提供的见解非常有限。对于要计算为净收入的多孔层段,该层段必须包含碳氢化合物,且应具有合理的渗透性,对于水驱来说,问题是,在特定的驱动机制下,应采用何种区间内的烃类来产生有意义数量的烃。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号