首页> 外文会议>Structural Engineers Association of California(SEAOC) Convention; 20050928-1001; San Diego,CA(US) >Friction Dampers For Seismic Upgrade Of A 14-Story Patient Tower With A 36-Foot Tall Soft-Story
【24h】

Friction Dampers For Seismic Upgrade Of A 14-Story Patient Tower With A 36-Foot Tall Soft-Story

机译:摩擦阻尼器,用于高14层高36层高软层的14层患者塔楼抗震

获取原文
获取原文并翻译 | 示例

摘要

This paper presents a unique solution for the seismic upgrade of a 14-story patient tower with a 36-foot tall soft-story. Cross-brace seismic dampers are utilized at the soft-story and they consequently reduce the story drift in half. The upgraded the building achieves the FEMA356 structural immediate-occupancy performance level under code defined 10%-50year seismic event. This unique solution has the following advantages: 1. It is very cost effective and resulted in approximately $1M savings on the foundation work compared to the conventional concrete shear wall seismic upgrade scheme. 2. It simplifies the construction process with minimum disturbances to an occupied hospital facility during construction. 3. It is aesthetically acceptable. 4. It adds structural integrity and improves building life safety. 5. It helps minimize post-earthquake structural and non-structural damage and reduce potential down time and repair costs after a seismic event.
机译:本文为14层高36英尺高软层患者塔楼的抗震升级提出了独特的解决方案。软故事中使用了跨支撑减震器,因此将故事漂移减少了一半。根据法规定义的10%-50年地震事件,升级后的建筑物达到了FEMA356结构即时占用性能水平。这种独特的解决方案具有以下优点:1.与传统的混凝土剪力墙抗震升级方案相比,它具有很高的成本效益,并节省了约100万美元的地基工作费用。 2.简化了施工过程,在施工期间对占用的医院设施的干扰最小。 3.在美学上是可以接受的。 4.它增加了结构完整性并改善了建筑物的生命安全。 5.它有助于最大程度地减少地震后的结构和非结构破坏,并减少地震事件后的潜在停机时间和维修成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号