首页> 外文会议>Symposium on Blast Furnace Upsets: Avoidance and Recovery; 20030603-05; Hamilton(CA) >PROBLEMS AT UPPER STACK AND BOSH REGION OF ERDEMIR NO.2 BLAST FURNACE AND TAKEN COUNTERMEASURES
【24h】

PROBLEMS AT UPPER STACK AND BOSH REGION OF ERDEMIR NO.2 BLAST FURNACE AND TAKEN COUNTERMEASURES

机译:2号高炉上层和上层区域的问题及应对措施

获取原文
获取原文并翻译 | 示例

摘要

ERDEMIR, which began production in 1965, today has a production capacity of 3.0 million tons/year of crude steel. It is the largest iron-steel company in Turkey and the only integrated flat steel producer. It produces plates, hot and cold rolled sheet and tinplate, all to international quality standards. ERDEMIR meets approximately half of Turkey's entire demand for flat steel and its products constitute the basic inputs for many different sectors in manufacturing industry, such as the automotive, pipes, white goods, pressurized containers and machinery. It also exports to a large number of countries, primarily to EU, U.S.A. and Japan. No.2 Blast Furnace (Zubeyde) is Erdemir's largest blast furnace. The first campaign of the No.2 Blast Furnace was started by blow-in operation on September 11,1978. Second campaign lasted approximately 12 years with a mid-campaign in 1995 and total hot metal production was 14,2 million tons. At February 27 ,1996 after two big slipping, channeling happened and the huge amount of semi melt materials stick the walls where the plates burnt. This block covered more than 1/3 of working volume of stack. This block tried to get rid off by effect of wall gas flow. As it is expected, after the Pulverized Coal Injection amount increased the heat load on the bosh region increased to considerably high values. Because of increased heat load and insufficient cooling at bosh section some hot spots and shell cracks were observed at the top of bosh shell just beneath the mantle region after 2 years from the mid-campaign. Some shell cracks were almost 2 meters long. Original structure of bosh region had a cylindrical shell and carbon refractory with water spray cooling system. After the detailed inspections, it was shown that lots of the carbon refractory was lost from the upper bosh near to mantle region. To keep furnace in operation until the next planned reline in 2000, two rows of cigar cooler were installed at the upper bosh and also carbon refractory injection was applied regularly inside the furnace. During these repairs in 1998, a reline team was assembled, consisted of personnel from engineering, blast furnace and refractory divisions to develop a feasible solution. Some important properties of No.2 Blast Furnace are given in Table.1.
机译:ERDEMIR于1965年开始生产,如今已具有300万吨/年的粗钢生产能力。它是土耳其最大的钢铁公司,也是唯一的综合扁钢生产商。它生产的钢板,冷轧薄板和马口铁均达到国际质量标准。 ERDEMIR满足了土耳其对扁钢总需求的大约一半,其产品构成了制造业中许多不同领域的基本投入,例如汽车,管道,白色家电,加压容器和机械。它还出口到许多国家,主要出口到欧盟,美国和日本。第二高炉(祖比德)是埃雷尔最大的高炉。 1978年9月11日,第二高炉的第一批生产通过吹炼开始。第二次运动持续了大约12年,1995年进行了中期运动,铁水总产量为1,420万吨。 1996年2月27日,在两次大滑移之后,发生了窜动,大量的半熔融材料粘在板燃烧的墙壁上。此块覆盖了堆栈工作量的1/3以上。该砌块试图通过壁气流的作用而摆脱。不出所料,在粉煤注入量增加之后,波什地区的热负荷增加到相当高的值。由于运动中部增加了热量,并且在运动中期没有充分冷却,所以从运动中期开始,在地幔区域下方的船壳顶部观察到了一些热点和壳裂。一些贝壳裂缝几乎长2米。波西区域的原始结构具有圆柱壳和碳质耐火材料,并带有水喷雾冷却系统。经过详细检查,结果表明,许多碳质耐火材料从靠近地幔区域的上波峰流失了。为了使熔炉保持运转直到2000年下一个计划的生产线,在上部炉膛上安装了两排雪茄冷却器,并且在熔炉内定期进行了耐火碳喷射。在1998年的这些维修过程中,组建了一个维修小组,由工程,高炉和耐火部门的人员组成,以开发可行的解决方案。表1给出了2号高炉的一些重要性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号