Frost Heave Problems Inside A Nuclear Power Plant

机译:核电厂内部的冻胀问题

获取原文
获取原文并翻译 | 示例

摘要

The ice condenser floors of a nuclear power plant had heaved upward and were binding against steam-vent doors. By drilling wells into the floors, insulating them, and thawing the ice beneath them, a large amount of water was pumped from the insulation beneath the floors. As a result, they dropped and created needed floor-to-door clear-ance. Although the partially dewatered floors are heaving again, they should not rise enough to become the problems they once were. In addition, the wells are in place for periodic dewatering should the need arise.
机译:一家核电厂的凝冰器地板已经向上举起,并与蒸汽通风门绑定在一起。通过在地板上钻井,对其进行隔热并融化其下方的冰,可以从地板下方的隔热层中抽出大量水。结果,他们掉落并创建了所需的落地间隙。尽管部分脱水的地板再次起伏,但它们不应升高到足以成为曾经的问题。另外,如果需要的话,这些井已经准备好进行定期脱水。