【24h】

WATSim Micro-Simulation: I-780/I-680/I-80 Corridor

机译:WATSim Micro-Simulation:780/680/80走廊

获取原文
获取原文并翻译 | 示例

摘要

The Greater San Franccisco Bay Area in Northern California has experienced significant growth over the last two decades. Thsi growth is anticipate to continue through year 2010, especially in Contra Costa and solano County. Initial studies have identified the I-780, I-680, and I-80 freeway corridors as critical links for the emerging growth areas in Contra Costa and solano Counties, and identified the need for an integrated transportation system. These studies have identified the need for additional capacity on I-680, I-780, I-80, and the Benicia-Martinex Bridge, additional toll plaza capacity, and ramp metering as potential actions for detailed study.
机译:在过去的二十年中,北加州的大旧金山湾区经历了显着增长。预计这一增长将持续到2010年,尤其是在Contra Costa和solano县。初步研究已将I-780,I-680和I-80高速公路走廊确定为Contra Costa和solano县新兴增长区的关键环节,并确定了对集成交通系统的需求。这些研究已经确定了在I-680,I-780,I-80和Benicia-Martinex大桥上需要额外的容量,额外的通行费广场容量以及坡道计量等作为进行详细研究的潜在措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号