首页> 外文会议>Twelfth European Conference on Soil Mechanics and Geotechnical Engineering, Jun 7-10, 1999, Amsterdam/Netherlands >Design and construction of the tunnel between Reichstag-building and the new Parliament-buildings in Berlin
【24h】

Design and construction of the tunnel between Reichstag-building and the new Parliament-buildings in Berlin

机译:柏林国会大厦与新国会大厦之间的隧道设计与施工

获取原文
获取原文并翻译 | 示例

摘要

The supply of the new Parliament district is realized by a development tunnel connecting Reichstag-building and the new Parliament-buildings. The rectangular shaped tunnel with a width of about 12,5m and a height of about 6,5m is founded down to 16m deep beneath ground surface and 13m beneath the groundwater level undercrossing the river Spree. Considering the different types of water-proof construction pits and different types of foundations and foundation slabs as well as the authority conditions in respect to the groundwater and the tight time schedule for the construction of all federal projects in Berlin's Spreebogen, complex construction methods had to be selected and are presented. First experience about the construction being carried out at the moment is reported about.
机译:通过连接德国国会大厦和新国会大厦的开发隧道来实现新国会区的供应。长方形的隧道宽约12.5m,高约6.5m,建在地下16m深处,横穿Spree河的地下水位以下13m处。考虑到不同类型的防水建筑工地,不同类型的地基和基础板以及有关地下水的授权条件以及柏林斯普雷伯亨所有联邦项目的紧张施工时间表,必须采用复杂的施工方法被选中并被呈现。报告了有关目前正在施工的初步经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号