【24h】

U.S.DEPARTMENT OF ENERGY YUCCA MOUNTAIN DESIGN UPDATE

机译:美国能源部尤卡山设计更新

获取原文
获取原文并翻译 | 示例

摘要

This paper provides a summary of the design activities that have taken place during 2003 on the Yucca Mountain Project(YMP).In addition to a series of internal studies conducted on all phases of repository design,international experience was sought and incorporated into enhancements to the surface facilities. This has resulted in significant improvements to the surface facility building layouts and functions. Improvements have also been made to the subsurface facility design and engineered barrier designs.
机译:本文总结了2003年期间在尤卡山项目(YMP)上开展的设计活动。除了对存储库设计各个阶段进行的一系列内部研究以外,还寻求了国际经验并将其纳入对库的改进中。地面设施。这大大改善了地面设施的建筑布局和功能。还改善了地下设施的设计和工程屏障的设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号