PILE DRIVING THROUGH A CAP: ASSOCIATED IMPACTS AND CONCERNS

机译:穿越桩顶驾驶:相关的影响和担忧

获取原文
获取原文并翻译 | 示例

摘要

Although a cap can be placed and has been proven to be an effective control and isolation mechanism for contaminated sediments, concerns have been raised by regulating authorities as well as project proponents as to the effects any construction or maintenance activities will have on a cap. Various remedial projects near or under existing or proposed pier structures have had to address and manage environmental and structural issues pertaining to pile removal, pile installation, and construction. The predominant environmental concern with pile driving is that contaminated sediments will either be exposed or contaminants themselves will be mobilized through pore water advection/migration to the biologically active zone or overlying water column. This paper will review the technical issues associated with driving piles through an environmental remedial cap. A summary of the technical concerns and precedence that has been set for driving piling into a cap will be provided. This will include a discussion of any measurable impacts, standard ways of mitigating potential impacts, regulatory precedence and project examples.
机译:尽管可以放置一个盖子,并已被证明是一种有效的控制和隔离受污染沉积物的机制,但是监管机构和项目支持者对任何建筑或维护活动对盖子的影响都提出了担忧。在现有或拟议的墩结构附近或之下的各种补救项目必须解决和管理与移桩,桩安装和施工有关的环境和结构问题。打桩的主要环境问题是受污染的沉积物将被暴露出来,或者污染物本身将通过孔隙水平流/迁移到生物活性区或上覆水柱而被运走。本文将回顾与通过环境补救措施上限打桩相关的技术问题。将提供为推动打桩机盖而设置的技术关注点和优先级的摘要。这将包括对任何可衡量的影响,减轻潜在影响的标准方法,法规优先级和项目示例的讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号