【24h】

Design of Gongboxia Concrete Face Rockfill Dam

机译:公伯峡混凝土面板堆石坝设计。

获取原文

摘要

1 GeneralGongboxia hydropower station is located on the mainstream of the Yellow River, on the borderbetween Xunhua Sala Autonomous County and Hualong Hui Autonomous County in Qinghaiprovince, 25km away from Xunhua county and 153km to Xining city. It is a large scale Class I (1) project, mainly for power generation, as well as irrigationand water supply purposes. The catchment area above dam site is 143619km2, meanannual runoff of 226×108m3, reservoir normal storage level at EL.2005.00m, and deadwater level at EL.2002.00m, design and check flood level at EL.2005.00m andEL.2008.28m respectively.
机译:1通用伯伯峡水电站位于黄河干流,位于青海省循化萨拉族自治县与华隆回族自治县的交界处,距循化县25公里,距西宁市153公里。这是一个大型的I(1)类项目,主要用于发电以及灌溉和供水目的。坝址以上集水面积为143619km2,年径流量为226×108m3,水库正常蓄水位为EL.2005.00m,死水位为EL.2002.00m,设计洪水位和洪水位分别为EL.2005.00m和EL.2008.28m 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号