Research on the Self-healing Waterstop of Perimeter Joint of Jilintai-I CFRD

机译:吉林台一CFRD周边节点自修复止水的研究

获取原文

摘要

1 Project generalizationJilintai-1 hydropower station is the tenth station in the planning of Kashi River basin, which is32km from Nileke County in west direction and located in the middle part of Jilintai gorgewhere Kashi River passing. For the said water power station, the total installed power capacity is460MW, the total storage capacity is 2.53 billion m3, the design flood water level is 1420.0m andthe dead water level is 1380.0m. The dam is concrete face sandy gravel rockfill dam with theheight of 157m and with 445m of crest length. The upstream face slope of which is 1:1.7 and thedownstream face slope is 1:1.96. To the dam face slab, area is 75250m2, the maximum sidelinelength is 256.7m.
机译:1工程概况吉林台一级水电站是喀什河流域规划中的第十个站,距尼勒克县西32公里,位于吉林泰峡谷喀什河经过的中部。该水电站总装机容量为460MW,总存储容量为25.3亿立方米,设计洪水水位为1420.0m,死水位为1380.0m。该坝为混凝土面板砂砾砾石坝,坝高157m,冠长445m。上游面坡度为1:1.7,下游面坡度为1:1.96。到坝面板,面积为75250m2,最大边线长度为256.7m。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号