首页> 中文学位 >Underground Mine Planning and Design Xinjiang Sareke Copper mine case study
【6h】

Underground Mine Planning and Design Xinjiang Sareke Copper mine case study

代理获取

目录

封面

声明

中文摘要

英文摘要

致谢

目录

1. INTRODUCTION

1.1 THE CONTEXT

1.2 SAREKE COPPER MINE

1.3 RESEARCH OBJECTIVES

1.4 SURPAC AND OTHER COMPUTER-AIDED UNDERGROUND MINE PLANNING SOFTWARE

2. BACKGROUND INFORMATION

2.1 SEARCH FOR OREBODIES

2.2 PLANNING AND DESIGN OF UNDERGROUND MINES

2.3 TYPES OF UNDERGROUND MINING METHODS

2.4 ROLE OF MAPS IN MINE DESIGN

3. METHODOLOGY

3.1 RESEARCH METHODOLOGY

3.2 RESEARCH DATA AND RESULTS

4. DESIGN AND PLANNING

4.1 CREATION OF SAREKE COPPER ORE DATABASE

4.2 MODELLING OF SURFACE TOPOGRAPHY MAP

4.3 MODELLING OF THE OREBODY

4.4 BLOCK MODELING

4.5 SAREKE COPPER ORE RESOURCE ESTIMATION

4.6 SUMMARY OF CHARACTERISTICS OF SAREKE COPPER ORE

4.7 SELECTION OF THE MINING METHOD

4.8 DESIGN OF THE DEVELOPMENT OPENINGS

4.9 THE RESEARCH FINDINGS (DISCUSSION)

5. CONCLUSION AND RESEARCH PROSPECT

5.1 CONCLUSION

5.2 RECOMMENDATION (RESEARCH PROSPECT)

参考文献

展开▼

摘要

尽管对地下开采和露天开采的采矿设计都是一项复杂的工程,本文所述的研究也更加复杂和具有挑战性。这是由于露天采矿的工作都在地表,而地下开采常与极端的恶劣条件联系在一起。本文综合设计开采的基本原则设计了新疆萨热克铜矿的地下开采方案,使得地下开采保证经济性和安全。本文的主要研究目标有:(1)建立矿体模型,并研究矿体特征;(2)设计地下开采开拓方案和矿柱尺寸;(3)根据矿体特性、岩石力学性质、开采率等因素,选择了最适合萨热克铜矿的开采方案。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号