首页> 外文学位 >Mill Creek Waterway Restoration Project, City of Visalia, Tulare County, California.
【24h】

Mill Creek Waterway Restoration Project, City of Visalia, Tulare County, California.

机译:加利福尼亚州图莱里县维塞利亚市的米尔河水道修复项目。

获取原文
获取原文并翻译 | 示例

摘要

This project was the first of its kind in the area to reduce urban flooding and bank erosion with ecologically-sensitive, habitat-enhancing restoration techniques. Funding came from the California Department of Water Resources Urban Streams Division with in-kind contributions from California State University, Fresno (CSUF), and City of Visalia. Work crews included personnel from CSUF, City of Visalia, and Redwood High School, and community volunteers. The project site was cleared and excavated, the stream channel was reconfigured and graded, and the banks stabilized. The subsequent revegetation effort involved almost 180 community volunteers, and CSUF and Redwood High School personnel.; The objectives were to: (1) reduce local flooding and bank erosion, (2) enhance riparian habitat, (3) shift public perception toward the value of open space, and (4) use the project as an educational "demonstration site" both during and after construction. All objectives were met to the delight of the funding agencies.
机译:该项目是该地区首个此类项目,它采用对生态敏感的栖息地增强修复技术来减少城市洪水和河岸侵蚀。资金来自加利福尼亚州水资源部城市河流处,加利福尼亚州立大学,弗雷斯诺(CSUF)和维萨利亚市提供了实物捐助。工作人员包括来自CSUF,维萨利亚市和Redwood高中的人员以及社区志愿者。清理并开挖了项目现场,对河道进行了重新配置和分级,并稳定了堤岸。随后的植被恢复工作涉及将近180名社区志愿者以及CSUF和Redwood高中人员。目标是:(1)减少局部洪灾和河岸侵蚀;(2)改善河岸栖息地;(3)将公众的视野转向开放空间的价值;(4)将项目用作教育的“示范点”施工期间和之后。所有目标都达到了供资机构的喜悦。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号