首页> 外文学位 >A SLAM II computer simulation model of underground production mining
【24h】

A SLAM II computer simulation model of underground production mining

机译:地下开采的SLAM II计算机仿真模型

获取原文
获取原文并翻译 | 示例

摘要

This work presents the development of a prototype SLAM II computer simulation model of underground production mining based upon a specific mining complex found at Inco Limited, Manitoba Division. Mining processes included in the model consist of production drilling and blasting, mucking and hauling, train tramming, and backfilling. Specific work shifts and chimney capacities are fixed at the start of the first simulation run, while activity times, hauling and tramming capacities, and equipment uptimes and downtimes are randomly sampled from their respective distributions.;Logic diagrams and time charts are used as communication tools to present some of the operational characteristics of the model. As a case study, the model was used to determine activity and system bottlenecks, as well as, the expected average daily production rate based on four typical mining blocks found at the complex.;Inputs to the model are easily changed to examine various other mining blocks and types of system configurations. Model outputs include the averages and confidence intervals for various availability ratios, production rates, activity times, as well as, a production schedule table. In addition, similar information is available on a per run basis, along with the daily and cumulative production rates, as well as, preliminary cost information.;The results from the study showed that computer simulation is an excellent tool for evaluating complex systems such as underground production mining.
机译:这项工作提出了一个基于地下采矿开采的SLAM II计算机模拟模型原型的开发,该模型基于在曼尼托巴省Inco有限公司找到的特定采矿综合体。该模型中包含的采矿过程包括生产钻探和爆破,填埋和拖运,火车践踏和回填。特定的工作班次和烟囱容量在第一次模拟运行开始时是固定的,而活动时间,牵引和有轨电车容量以及设备正常运行时间和停机时间则是从各自的分布中随机采样的;逻辑图和时间图被用作通讯工具展示模型的一些操作特征。作为案例研究,该模型用于确定活动和系统瓶颈,以及基于该工厂发现的四个典型采矿区块的预期平均每日生产率。;可以轻松更改模型的输入以检查其他各种采矿系统配置的块和类型。模型输出包括各种可用率,生产率,活动时间以及生产计划表的平均值和置信区间。此外,每次运行都可获得类似的信息,以及每日和累计的生产率以及初步的成本信息。研究结果表明,计算机仿真是评估诸如地下开采。

著录项

  • 作者

    Litke, Alan Brian.;

  • 作者单位

    University of Manitoba (Canada).;

  • 授予单位 University of Manitoba (Canada).;
  • 学科 Mining engineering.
  • 学位 M.Sc.
  • 年度 1994
  • 页码 216 p.
  • 总页数 216
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号