Assessment and Development of Contractors' Mitigation Practices Towards Risks out of Contractors' Control in the Saudi Construction Industry

机译:评估和制定承包商的缓解措施,以消除沙特建筑业承包商无法控制的风险

获取原文
获取原文并翻译 | 示例

摘要

Recent studies have identified that contractors in the Saudi construction industry are not the main party that cause risks as owners and other parties have the major share of causing risks. However, with the identification that risks out of contractors' control are a leading cause of low performance, there is a lack of efficient risk mitigation practices in Saudi to manage these risks. The main aim of this dissertation is to assess the current practices applied by contractors to minimize risk out of their control and develop a risk mitigation model to manage these risks. The main objectives of the study are: investigating the risks that are out of contractors' control, assessing the contractors' current risk mitigation and performance measurement practices, and finally developing and validating a risk mitigation model to minimize risks out of contractors' control and measure performance of involved project parties. To achieve the study aim, a mixed methodological approach was adopted. Theoretical approaches were utilized to review previous research and to develop a conceptual risk mitigation framework followed by a practical approach that is considered with collecting data from contractors. The quantitative method was mainly used to meet the study objectives through distributing a survey in the form of a questionnaire. As a consolidation of the study findings, the top ranked risks that are out of contractors' control were identified. Furthermore, the results identified that the contractors' current risk management and performance measurement practices are not effective in minimizing projects risks caused by other parties and ineffective in measuring performance of all parties. The developed model focuses on increasing accountability of project parties through mitigating project parties' activities and risks with measuring the deviations and identifying sources of deviations. Transparency is utilized in the model through sharing weekly updates of the activities and risks combined with updated information of performance measurements of all project parties. The study results showed that project risks can be minimized and projects' performance can be increased if contractors shift their focus using the developed model from only managing their own activities and risks to managing all project parties' activities and risks.
机译:最近的研究表明,沙特建筑业的承包商不是造成风险的主要方,因为业主和其他方在造成风险中占主要份额。但是,由于发现承包商无法控制的风险是导致绩效低下的主要原因,沙特阿拉伯缺乏有效的风险缓解措施来管理这些风险。本文的主要目的是评估承包商目前采用的实践,以最大程度地降低其无法控制的风险,并开发一种风险缓解模型来管理这些风险。该研究的主要目标是:调查超出承包商控制范围的风险,评估承包商当前的风险缓解和绩效衡量实践,最后开发和验证风险缓解模型以最大程度地降低承包商无法控制和衡量的风险参与项目方的表现。为了达到研究目的,采用了混合方法论方法。理论方法被用于回顾以前的研究并建立概念性的风险缓解框架,然后是从承包商收集数据时考虑的实用方法。定量方法主要用于通过以问卷形式进行调查来达到研究目的。作为研究结果的合并,确定了承包商无法控制的排名最高的风险。此外,结果还表明,承包商当前的风险管理和绩效评估实践无法有效地最小化其他方带来的项目风险,也无法有效评估所有方的绩效。所开发的模型着重于通过测量偏差和识别偏差的来源来减轻项目方的活动和风险,从而提高项目方的责任感。通过共享活动和风险的每周更新以及所有项目方绩效评估的更新信息,模型中使用了透明度。研究结果表明,如果承包商使用已开发的模型将重点从仅管理自己的活动和风险转移到管理所有项目方的活动和风险,则可以最大程度地降低项目风险并提高项目绩效。

著录项

  • 作者

    Algahtany, Mohammed.;

  • 作者单位

    Arizona State University.;

  • 授予单位 Arizona State University.;
  • 学科 Engineering.;Civil engineering.;Management.
  • 学位 Ph.D.
  • 年度 2018
  • 页码 143 p.
  • 总页数 143
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号