首页> 中文期刊> 《建筑技术》 >室内干挂树脂板装饰墙面施工工艺

室内干挂树脂板装饰墙面施工工艺

         

摘要

北京协和医院门急诊楼与手术科室楼改扩建一期工程采用室内干挂树脂板墙面,图纸深化设计要求多,树脂板交接部位复杂多样.通过对大面积树脂板挂装系统的选择、优化和树脂板龙骨施工测控调节,以及采取了合理的施工工艺与安装控制标准等,确保了树脂板的安装质量.%Dry -hanging resin panel decorated interior wall is used in Phase I of reconstruction and expansion project of outpatient and emergency building and surgical department building of Peking Union Medical College Hospital. The drawings of such wall have high requirements for in-depth design and the connection position of resin panel is diversified and complicated. Installation quality of resin panel is successfully guaranteed through selection and optimization of large resin panel hanging system, measurement and control of resin panel channel construction, adoption of reasonable construction process and application of installation and control standards, etc.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号