某大型冷却塔工程属大体积混凝土结构,施工中通过优化配合比,合理选材,安排钢筋绑扎及模板搭设工序,从浇筑混凝土到后期养护施行全过程温度控制,有效控制了结构开裂,提高了工程质量.%During construction of a large cooling tower of massive concrete structure, structural crack is effectively controlled and engineering quality improved through optimization of mixing proportion, reasonable material selection, arrangement of construction sequence for steel bar binding and formwork installation, as well as whole-course temperature control from concrete casting to late curing.