总结基于BIM技术和工效数据库,利用线性计划的形式对施工进度进行管理的方法;介绍使用BIM模型构件对应统一作业编码的管理,利用模型工程量和项目进度技术数据库进行计划编排,并用线性计划形式将进度在时间与空间同时展示,在施工中进行动态监控和调整,实现了进度的精细化管理.%This paper summarized the method of using BIM technique and work efficiency database-based linear plan to realize construction schedule management. BIM model component was used for management of uniform work code, model workload and construction schedule technical database were adopted for organization of construction plan, and linear plan for simultaneous time and space demonstration. Dynamic monitoring and adjustment during construction successfully realized refined management of construction schedule.