某大型建设项目分部分项工程较多,涉及不同设计单位、施工单位,现有计划进度管理软件无法满足需求,为此基于.NET平台设计计划进度管理信息系统,包括范本编制、计划编制、进度编制、投资计划编制、查询分析与监控和信息发布6个模块,全面实现了对时间进度、工程进度和形象进度的精细化过程控制,涵盖了从工程设计到工程竣工计划进度管理全过程,同时该系统也是项目综合管理信息系统的—部分,可实现与其他子系统的数据流通.%A large construction projects contain more partial project which involve different design units,construction units.The existing schedule management software can't meet demand.Therefore,based on the.NET platform,we can design a schedule management information system.The system includes compilation of model,compilation of plan,compilation of progress,compilation of investment plan,query analysis and monitoring and Information dissemination six big modules,which are covering the whole process from engineering design to project completion schedule management.The system has achieved the goal that the refinement process on the time schedule,the progress of the project and the figure of progress control.At the same time,the system is a part of the construction project integrated management information system,which can realize data flow with other subsystems.