电力生产与国民经济各部门和人民的日常生活关系密切,为保证电力系统的安全稳定性,需要进行大量的测量、分析和计算以确保实时准确掌握电力系统的运行状态。本文在文献一的基础上继续研究了系统开发仿真的问题。。以32节点系统为例,验证程序计算结果,并对故障前后的电压进行分析。通过与 PSASP 软件计算结果对比分析,验证了本文计算结果较为理想,电压差值数量级在,应用效果良好。% Power production and national economic sectors and people's daily lives are closely related, in order to ensure the safety of power system stability, the need for a large number of measurements, analysis and calculations to ensure that real-time accurate information on power system operation status. Based on paper 1,wo continue discuss 22 node system, for example, the validation process the results, and before and after voltage failure analy-sis. By comparing the results with PSASP software analysis, verification of the results of this calculation is more ideal, the difference in voltage magnitude at, with good results.
展开▼