在重力式码头工程厦门港嵩屿港区二期岸壁工程B标段项目中,通过对后方置换砂基振冲密实的施工实践,总结了使用大功率振冲器进行大面积砂基密实的施工处理方法,可为同类工程设计与施工提供参考。%During the section B of the second phase project of Songyu port quay wall of the gravity wharf engineering,based on the rear replacement sand base vibro compacting construction practice, the use of high-power vibro compacting the con-struction of a large area of sand base approach is summarized,which can provide references for the design and construction of similar projects.
展开▼