首页> 中文期刊> 《煤炭科学技术》 >煤矿下井电缆短路故障限流方法研究

煤矿下井电缆短路故障限流方法研究

         

摘要

介绍了大容量高速开关FSR的工作原理及结构,论述了将FSR并联在电抗器两端串接于煤矿下井电缆线路中的限流方法。通过分析其动作时序与EMTP/ ATP仿真模型,对煤矿供电系统正常及短路时线路电流、电压变化过程进行了深入研究。EMTP/ ATP仿真结果表明,采用该方法既可有效限制短路电流水平,又能减小限流电抗器在线路正常工作情况下的能耗损失。%The paper introduced the work principle and structure of the high volume and high speed switch FSR and stated a current limited method with FSR parallel to the two ends of the reactor connecting with electric cable line in underground mine. With the analysis on the action time sequence and the EMTP/ATP emulation model, a deep study was conducted on the current and voltage variation process when the mine power supply system was in normal operation or in short circuit. The EMTP/ATP emulation results showed that the applica- tion of the method could effectively limit the current level of the short circuit and could reduce the energy consumption and lost of the cur- rent limited reactor when the circuit was in normal operation.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号