In the 300 MW offshore wind power demonstration project of Puti island in Laoting of Tangshan, the engineers finished the 21 caps which should to overcome the high technical requirements, construction difficulty, construction conditions and many other difficulties. The paper shares the technology and methods of the pier construction in detail.%在进行唐山乐亭菩提岛海上风电场300MW示范工程施工时, 技术人员克服技术要求高、施工难度大、施工工况恶劣等一系列困难, 完成了其中21台高桩混凝土承台基础的施工任务, 论文就该项目承台施工进行介绍.
展开▼