To meet the requirement of high quality synthetic camphor production, the existing producing process was improved. By adding the action of hot water washing of isobomeol and centrifugal as well as proposing related process of reduction ofisoborneol washing wastewater and product recovery, it is achieved the abatement, avoiding a substantial increase in the wastewater and reducing the difficulty of the wastewater treatment simultaneously.%文章针对高品质合成樟脑生产要求,改进现有生产工艺,增加了异龙脑的热水洗涤和离心操作,并提出了异龙脑洗涤过程中废水减排和产品回收的相关工艺,实现了减污,避免了废水的大幅增加、降低了废水处理难度。
展开▼