高州水库移民生产安置规划方案探讨

         

摘要

Gaozhou reservoir reinforcement project to restore normal water level flooded 89.0m deal involving 4326.13 3599.56 acres of arable land and acres of parkland, the calculation, the project base year ( 2008 ) involved in the production resettlement population 9861 people, the planning year ( 2017 ) production resettlement population of 10440 people. According to the conventional production of medium-sized hydropower project resettlement and local conditions and characteristics of the reservoir inundation, three ways have been proposed in the early rehabilitation:agricultural resettlement, a one-time monetary compensation and long-term compensation and resettlement.To investigate the effect of these three production resettlement of immigrants, their advantages and disadvantages, to provide a reference for the future implementation of this project or similar projects related to the production of the resettlement plan.%高州水库除险加固工程水库恢复89.0 m正常蓄水位淹没处理涉及耕地288.40 hm2和园地239.97 hm2,经计算,本工程基准年(2008年)涉及生产安置人口9861人,规划水平年(2017年)生产安置人口10440人。根据大中型水利水电工程常规生产安置方式,并结合当地实际和水库淹没特点,初拟以下3种生产安置方式:农业安置、一次性货币补偿及长期补偿安置。探讨这3种生产安置方式对移民的影响,分析各自的优缺点,为将来本项目实施或类似项目相关生产安置规划提供参考。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号