首页> 中文期刊> 《公路工程》 >现浇高箱梁支架跨过暗河设计及施工技术

现浇高箱梁支架跨过暗河设计及施工技术

         

摘要

满堂支架的稳定性是影响箱梁质量的重要因素之一,而地基承载力是否满足支架稳定性是支架是否实施的关键因素之一.吉茶高速公路k27 +000 - K27+ 150现浇高箱梁跨越暗河,通过对该现浇高箱梁支架和跨暗河方案的设计、计算和实践,对满堂支架在复杂地域施工,提供了借鉴和参考作用.%The stability of the bunch stents is one of the important factors to influence the quality of box girder, and whether the bearing capacity of foundation can support the stents is one of the key factors for implementation. The cast-in-place high box girder located in the Jicha expressway k27 + 000 ~ k27 + 150 is crossing the underground river, through the design? calculation and practice for this Scheme, it can provide reference that how bunch stents work in complex regional construction.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号