This article elaborates the high slope cut' s construction processes and methods from aspects of high slope earthwork excavation ,slope protection, drainage works timely follow-up, monitoring and measuring the slope's stability in construction process.%从高边坡路堑土石方开挖方法、边坡防护、排水工程及时跟进施工,施工过程中对边坡稳定性的监控量测方面,阐述了高边坡路堑的施工工序和施工方法.
展开▼