The design experience of operation mode in auxiliary power of Xiluodu Hydropower Plant is introduced .By means of analyzing main electrical wiring and auxiliary power system wiring , the suggestions on safe and scientific opera-tion mode of auxiliary power are put forward .According to the different operating modes , potential risks are analyzed and corresponding measures are presented .The results indicate that systematical wiring is scientific , reliable and reason-able in equipment configuration , flexible in operation mode , which provides reference for other hydropower plants .% 介绍了溪洛渡水电厂厂用电运行方式设计的经验,通过对电气主接线、厂用电系统接线方式的分析,提出了安全科学的厂用电运行方式建议。针对不同的运行方式,分析可能发生的风险,提出相应的解决措施,系统接线科学、可靠性高,设备配置合理,运行方式灵活,可供其他大型电厂借鉴。
展开▼