首页> 中文期刊> 《国际泥沙研究:英文版》 >ASPECTS OF RIDGING AND CROPPING FOR GULLY RECLAMATION

ASPECTS OF RIDGING AND CROPPING FOR GULLY RECLAMATION

         

摘要

The history of a gully which developed on a slope at the campus of the Federal University of Technology, Owerri, Nigeria is briefly discussed. Civil engineering measures were taken to cut off the upstream catchment area, close the gully with bulldozers and construct contour bands to divide the slope in sections. Subsequent agricultural development of the area had not been completed which continued the threat of renewed gully formation An experimental field was established on the 2 ha slope where field trials were set up of ridging and cropping to develop proper methods to complete the gully reclamation process. The selected cropping patterns for different sections of the field and problems encountered in the research are discussed. Some concluding remarks and recommendations are made: 1) Hydrology 2) plant protection 3) agronomy at the Federal University of Technology, Owerri - Nigeria.
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号