首页> 中文期刊> 《国际泥沙研究:英文版》 >ABRASION OF THE BOTTOM OUTLETS AND ITS REPAIR IN SANMENXIA PROJECT

ABRASION OF THE BOTTOM OUTLETS AND ITS REPAIR IN SANMENXIA PROJECT

         

摘要

The Sanmenxia Project completed in 1960 is a multi-purpose hydro project with emphasis on flood control. After the expounding, serious deposition occurs in the upstream part of the reservoir and the Weihe River. The project has to be rebuilt twice in the period from 1964 to 1978. Thus the discharge capacity is greatly enlarged by excavating two side tunnels on the left bank, converting three penstocks into sluice conduits and reopening & bottom outlets formerly used for di- version. By changing the operational mode from storing water year round to stor- ing clear water during the dry season and sluicing sediment during the flood season, the sediment problem of the reservoir is largely solved and multi-purpose benefits of the project are partially retained. But the heavy sediment load still caused serious abrasion on bottom outlets and turbines, particularly on the inlet gate slot, the service gate slot and the floor. Much effort has been made to clarify the mechanism of the damage and to choose abrasion-resistant material for repair. The repair of the bottom outlets has been going on since 1980. This paper describes the abrasion on the bottom outlets in details and the subsequent repair effected.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号