首页> 中文期刊> 《中南大学学报(英文版)》 >Copper smelter slag treatment by ammonia solution: Leaching process optimization

Copper smelter slag treatment by ammonia solution: Leaching process optimization

         

摘要

The feasibility of copper smelter slag processing by ammonia solution treatment was investigated. The central composite rotatable design(CCRD) and approximation method were used to determine the optimum conditions of zinc and copper recovery to a solution. The experimental design was done at five levels of the four operating parameters which were the initial concentration of NH–3, the initial Cl ions concentration, leaching time and solid/liquid ratio. Two mathematical models describing dependence of metal recovery on the operating parameters were obtained. The models are successful in predicting the responses. It was found that optimal parameters for zinc and copper recovery are as follows(values for copper are given in brackets): initial CNH3 17.1%(19.9%), initial CCl– 160 g/L(160 g/L), leaching process duration 4.56 h(4.13 h), solid/liquid ratio 0.39(0.53). The maximum Zn and Cu recoveries to solution, obtained experimentally under the conditions, are 81.16% and 56.48%, respectively.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号