Based on the analysis of the RB test process of the blower of the 1000MW unit in Taishan Power Plant,this essay introduces tile cause of the MFT of the boiler and gives relevant solutions which can modify and improve the RB control circuit of the blower,rectify the dynamic changes of the blower,optimize the RB logic of the blower and lay a solid foundation for subsequent RB tests.%通过对台山电厂1000MW机组送风机RB试验过程的分析,找到导致锅炉MFT的原因,提出解决方案,对送风机RB控制回路进行修改和完善,修正风机的动态变化过程,优化送风机RB逻辑,为后续RB试验成功奠定坚实基础。
展开▼