分析国华台山电厂600MW亚临界机组3#高加钢管泄漏,引起高加汽侧壳体超压变形事件的原因,并提出相关的解决措施,以确保机组的安全运行。%This essay analyzes the hyper-pressure of the housing of the steam side of the HPH of the 600MW subcriti cal unit in Guohua Taishan Power Plant caused by the leakage of 3# steel tube as well as giving relevant solution to ensure the secure operation of the unit.
展开▼