介绍国内燃油电厂首座LNG站、调压站的主要设备及工艺流程,并根据现场生产技术需要,提出设备工艺改进措施,为电厂机组安全运行提供保障。%This essay introduces the major equipment and process flows of the first LNG station and the first regulator station in a domestic oil-fired power plant. In accordance with the technological requirements of the on-the-spot pro-duction,this essay puts forward relevant improvement measures for both the equipment and the process, to ensure the secure operation of the units in the power plant.
展开▼