从串联电抗器的实际安装运行条件出发,建立电路模型,对10kV并联电容器组合闸的过渡过程进行理论分析和仿真计算,提出合闸时断路器故障与过电流和过电压相关的结论。%Based on the requirements for the installation and the operation of the series reactor,this essay introduces the establishment of a circuit model,the theoretical analysis and the simulative calculation for the transient process of the switching of 10kV shunt capacitor banks,and presents relevant theories about breaker failures,over-current and over-voltage in switching.
展开▼