介绍了湖北省49.5M W风电场工程概况,对水土流失原因进行了分析,得出水土流失主要发生在施工准备期和施工期,并采用工程类比法预测了水土流失量,针对该工程特点给出了水土流失治理措施,为类似风电工程提供参考。%This article introduces the project of 49 .5MW wind farm in Hubei Province ,analyzesthe reasonsof-water and soil loss ,and the conclusion is that soil and water loss occurs mainly in the preparation and con-struction period of theconstruction .And then it usesthe engineering analogy method to predict water and soil loss and puts forwardthe control measures according to the engineering characteristics ,so as to providerefer-ences for similar wind power projects .
展开▼