首页> 中文期刊> 《兰州石化职业技术学院学报》 >引汉济渭工程 TBM同步衬砌施工中端头模板的改进

引汉济渭工程 TBM同步衬砌施工中端头模板的改进

         

摘要

In the process of the two lining construction of the existing tunnel,the large hydraulic steel formwork trolley is widely used,but for the end of the template or the use of small pieces of board assembly,the effect has a great impact on lining construction quality.Through the improvement of the end head template,using a double hinged split chip can flip the assembled steel end,making the construction of the lining of the end of the template assembly modular,assembly efficiency is greater.In the existing process of secondary lining of tunnel,some large hydraulic steel template trolleys have been widely used.But the end template is still assembled from small pieces of wood.Whether the end template is good or bad has a great impact on the quality of lining construction.We use a kind of flipped,double -hinged,sliced and assembled steel template to improve the end template,making the as-sembly of end template in lining construction.What’s more,the assembly effect has become more reliable and the assembly efficiency has been greatly improved.%在现有隧洞二次衬砌施工过程中,大型液压钢模板台车得到广泛应用,但是端头模板还是采用小片木板拼装而成,端头模板拼装效果的好坏对衬砌施工质量有着很大影响。通过对端头模板改进,采用一种双铰接分片可翻转式组装钢端模,使得衬砌施工中端头模板的拼装模块化、机械化、简便化,拼装效果更加可靠,拼装效率更高。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号