首页> 中文期刊> 《现代交通学报:英文版》 >New technologies for high-risk tunnel construction in Guiyang- Guangzhou high-speed railway

New technologies for high-risk tunnel construction in Guiyang- Guangzhou high-speed railway

         

摘要

Based on the construction of high risk tunnels in Guiguang-Guangzhou high-speed railway,several new technologies were developed for high-risk tunnel construction.First,an integrated advanced geological prediction was developed for tunneling in karst area.Then,a new system of ventilation by involving the dedusting technology was proposed and used in the field,which received a good air quality.Finally,a method to minimize the distance between the working face and the invert installation was proposed by optimizing the invert installation and adopting the micro bench method.Applying the method to the project obtained an excellent result.The achievement obtained for this study would be able to provide a valuable reference to similar projects in the future.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号