结合青岛市游泳跳水馆看台的工程实践,提出了全新的看台施工方案,即看台梁板分两次浇筑,以及具体操作工艺,并重点阐述了看台板模板支设、钢筋绑扎、混凝土浇筑等关键技术,提出了保证施工方案顺利实施的诸多技术措施.%With consideration of the engineering practice of Swimming Diving Hall in Qingdao,the paper puts forward a new stand construction plan that the beam and plate will be done by two castings,and some specific operation process.It focuses on the stands beam formwork support,the reinforcement assembling set,and concrete casting.The key technology wants some technical measures that ensure the smooth implementation of the construction.
展开▼