首页> 中文期刊> 《中国安全生产科学技术》 >基于FTA-Reason的施工作业高空坠落风险预控研究

基于FTA-Reason的施工作业高空坠落风险预控研究

         

摘要

In order to control the high falling risk of construction operation in advance, the Fault Tree Analysis ( FTA) method was applied to construct and analyze the fault tree for the high falling accident in construction opera-tion. Through modifying the classical Reason model, the pre-control model of high falling accident in construction operation was established, which included five guarding levels such as organizational factors, safety supervision, operating conditions, premise of safety behavior and safety behavior. In the process of risk pre-control, through u-sing the above model, the high falling risk in construction operation can be pre-controlled pertinently, which can provide reference for risk management of construction safety.%为了对施工作业中高空坠落风险进行预控,采用故障树法对施工作业高空坠落事故进行了故障树的构建、分析,继而通过对经典Reason模型进行改造,建立了施工作业高空坠落事故的预控模型,包括组织因素、安全监督、操作条件、安全行为的前提以及安全行为5个防御层次。在风险预控的过程中,通过运用建立的施工作业高空坠落风险模型,可以对施工作业中的高空坠落风险进行针对性地预控,为施工安全风险管理提供参考。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号